EGCE 438 California State University Washita Watershed Discharge Project
Question Description
The Washita watershed includes 3 sub-basins (Sub) each of which equipped with a rain gauge station. Giventhe information and data below, estimate the discharge at Junctions 1 and 2.Please write a report for this project that has title, author name, introduction, results and discussion,conclusions and if you used any references, a references section.Your report should describe what you have learned by doing this project. Just saying I learned how to createa schematic or junction is not adequate. Please write down the hydrologic behavior of the model you justcreated. Based on the output, what can you tell about the parameters used in the model and how they affectthe outflow hydrograph (peak value, time to peak and base time). Support your answers with appropriatenumbers and graphs.
This a project regarding Watershed Report. Further details of the Project can be found attached as well as references.
Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."