Site icon Cliff Notes

CE 438 California State University Fullerton Washita Watershed Project and Paper

CE 438 California State University Fullerton Washita Watershed Project and Paper

Question Description

The Washita watershed includes 3 sub-basins (Sub) each of which equipped with a rain gauge station. Given the information and data below, estimate the discharge at Junctions 1 and 2. Please write a report for this project that has title, author name, introduction, results and discussion, conclusions and if you used any references, a references section. Your report should describe what you have learned by doing this project. Just saying “I learned how to create a schematic or junction” is not adequate. Please write down the hydrologic behavior of the model you just created. Based on the output, what can you tell about the parameters used in the model and how they affect the outflow hydrograph (peak value, time to peak and base time). Support your answers with appropriate numbers and graphs.

This a project regarding Watershed Report. Further details of the Project can be found in the link:

https://drive.google.com/drive/folders/1kvtw6sWKsq…

The attached is the sample one, which needs to be made. You can have a look at that.: (But you have to make original work)

I will extend upto 44 hours or so

Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."

Exit mobile version