Dublin Institute of Technology Replacement Method Road Construction PPT
I dont understand this Engineering question and need help to study.
Your company have been awarded a building and road constructionproject involving the construction of a 5 kilometre double lane roadacross a green field site. Included in the contract is the building of a castin situ concrete three storey structure measuring 50 metres by 15 metreswith a reinforced concrete roof and roof garden. You as the ConstructionManager appointed to the job are required to:
- Investigate typical options for the construction of the road andbuilding and choose one.
- From you choice of method above, you are required to investigatethe type of plant and materials required to carry out this project.Your findings should be presented in a formal report to themanaging director of the company.
- You are also required to make a power point submission availableon your proposals that could be shown to the project team toexplain the project.
Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."