WVU Petroleum Engineering IPR for An Oil Well from Your Drilling Project Site
Question Description
I want to complete the project, in word document, and excel file.
the excel file for plot and calculations, and the word file for the report (Executive Summary,Introduction,Objective/Problem statement, Approach/methodology, Results and discussion, Conclusion, References):
The assignment for this project is to calculate and plot the InflowPerformance Relationship (IPR) for an oil well from your drilling project site.Plot bottom-hole flowing pressure versus flow rate. If you do not have an oilwell from the drilling project, you need to select a new well for thisassignment.You can prepare your plot using either flow test results or formation and fluidproperties. Please see example plots in chapters Six and Seven in the textbookand corresponding tables with data used in the preparation of plots. (e.g. SeeFigure 6.3 in textbook).Your final report should be submitted in MS Word format onthe Turnitin assignment page. Additional links will beprovided for submitting supplemental documents. Pictures orphotos of write ups and/or equations are unacceptable in thereport.Report writing guidelines and required contents are given in the coursesyllabus. Use proper name convention for all files submitted.Name convention is repeated here for report file.
I have attached an old project so that you can look at it and have an idea how the project should look like.
I have attached The information about the well that I have chosen, the description of the project)
once I get in contact with you, I will send you the slides for this course.
(Do NOT copy from the old project please.)
Have a similar assignment? "Place an order for your assignment and have exceptional work written by our team of experts, guaranteeing you A results."